The office · Construction & trades

Estimate faster. Change orders on paper.

A site trailer with drawings and a schedule pinned to the wall, an estimator beside a First Stop consultant pointing at a laptop, hard hats and rolled prints on the table

On the call, we would ask

  • How many bids go out a month, and how many do you win?
  • Where do change orders get lost: in the field, in the office, or between them?
  • What does a foreman have to type at the end of the day, and does it get typed?
  • Which system holds the job cost, and does anyone trust it before the job is over?