The office·Metrology·Writing the inspection program
The CMM program takes a day to write. The drawing already says what to measure.
On the call, we would ask
- How long does an inspection program take to write, and how many are waiting?
- Is the drawing model-based, or a PDF with dimensions on it?
- What does the programmer decide that the drawing does not say: probe, approach, fixture?
- How is a new program proved before it is trusted?
Also under Metrology
- Writing the inspection program
- Gauge data as it happens
- Vision measurement, plainly
