The office·Metrology·Writing the inspection program

The CMM program takes a day to write. The drawing already says what to measure.

On the call, we would ask

  • How long does an inspection program take to write, and how many are waiting?
  • Is the drawing model-based, or a PDF with dimensions on it?
  • What does the programmer decide that the drawing does not say: probe, approach, fixture?
  • How is a new program proved before it is trusted?

Also under Metrology